Managing your gold
mining process with a eco-friendly mobile gold mining processing plant
simplifies your operation and increases your Return on Investment. Mobile gold
mining equipment allows you to process your material at the source thus,
reducing transport costs.
Innovative off grid solar and wind powered eco-friendly
mobile mining gold ore of alluvial processing plants are designed for the
harshest of environments such as Africa, Central America and South America.
The new types of sustainable powered eco-Friendly mobile
gold and precious metal processing plants are the first of their kind, offering
a truly off grid self-contained sustainable energy system. Mobile production
mining systems range from small artisan gold mining systems to large high
production gold mining units that offer 24/7/365 off grid gold, precious metal,
and gemstone (diamonds and precious stones) processing at a 98% efficiency.
Powered primarily by sustainable energy and equipped with a mini diesel
generator as a standby, mobile gold and precious metal mining equipment allow
mining companies in Africa, Central and South America to be mobile and off grid
for their energy and gold mining needs.
Mining companies can now process their material anywhere
eliminating the high transportation costs of moving their material to a
processing plant. Mobile mining processing plants now allow ore and alluvial
gold processing at the source.
The eco-friendly mobile gold mining processing plants work
off of a series of tables and allow for secure storage of the captured gold and
an enclosed lab. Satellite communication or GSM based can be integrated into
the gold processing plant allowing for IP based security cameras to allow
management to monitor the gold processing operation.
ENERGY SYSTEMS The mobile off grid energy systems are
developed to provide power for the following processes;• Power the high
efficient ½ hp motors that power the linear motion of the tables• Power the
water pumps utilized for the gold concentration process• Power the gold vacuum
driven collection system• Power the LED operational lighting system for the
gold processing area• Power the energy management and diagnostics including the
laptop computer• Power optional security camera systems and visual data logging
STANDBY ENERGY SUPPLY & FUEL CONSUMPTIONAs a standby and
additional field power source, the mobile gold processing plants can have a 7
KVA diesel generator tied into the power system with automatic switch gear. The
automatic switchgear will initiate a generator startup upon a low voltage
battery condition that can be caused by a component failure. The Generator at
60% load will utilize 1.5 liters per hour (based upon average field
conditions). With the expanded double wall DOT approved fuel cell the mobile
gold processing plant has enough fuel for approximately 151 hours of operation.
ENERGY COMPONENTSThe energy equipment standard on all mobile
gold mining systems includes 16 US made 300 watt high efficiency solar panels
with high quality inverters. Depending on site wind conditions, an optional
tilt-up 2.5kW variable pitch wind turbine is installed at the front of the
processing trailer. All energy harvesting and control equipment is mounted in
the trailer enclosure at the front of the trailer. Each solar panel’s health
and output can be monitored from the laptop computer.
SETUP & DURATIONThe gold
processing plants require less than 2 normal working days, under most
conditions, to be setup and running. All connections and assemble points are
color coded and numbered for a swift and simple assembly. Each processing plant
includes additional hardware and a toolkit capable of servicing all components
SYSTEM OPERATIONAL SAFETYMobile gold processing plants are
developed to conform or exceed all engineering, mechanical, and electrical
safety standards. All moving parts are painted yellow. All pinch points are
guarded and painted red. The supplied electrical components are UL approved
(for North, Central and South American markets) and are protected via a GFI
supplied electrical system. Two push button E-STOPs should be located on each
side of the trailer. The setup of the trailer requires a supplied copper
grounding rod to be driven into the ground for the protection of a direct
lightning hit in addition to supporting the proper grounding of the sustainable
energy harvesting equipment. All electrical wiring is run through PVC conduit.
All energy harvesting components are securely wall mounted and connections
including wire are shielded from the accidental contact of a site worker.
Multilingual advisory placards are strategically located to clearly indicate
the potential hazard condition. All electrical components are double grounded.
Each component is protected by a properly sized breaker system with matching
wire size. Breaker panel is located within the trailer enclosure/lab. Full
onsite training is available and supplemented by multilingual easy to read and
understand booklets. For illiterate workers, one-on-one training must be
provided.
MATERIAL REQUIREMENTSThe material to be processed must be
crushed and classified to a size ranging for 150-200 mesh. The material size is
very imports for the separation of precious metals form non-value minerals. If
the ore material is of high sulfide count a pre-roasting condition may apply.
Ferris based metals are captured and removed through a multi-level magnet
system located in the feed shoot.
The post-concentration material can be directed to virtually
any location on the mine through manual or automatic means. For “open sky”
mines, I recommend the stockpiling of the for the environmental purpose of
filling the pit back in.
I also recommends mining companies perform random tailings
testing via a small supplemental series of tables mounted on a trailerArticle Submission,
or lab testing to ensure the complete capture of high value material.